8,200 sq ft building had facade repairs under the San Francisco Facade Maintenance Program, including window replacement, ornamental restoration, concrete crack repairs, and complete exterior painting across twelve elevations to restore the building envelope.

Project Duration: 3 Months

Key challenges overcome:

  • Ornamental Restoration: Repaired and restored deteriorated architectural ornaments across the facade while preserving the building’s original appearance.
  • Lead-Safe Practices: Completed all painted-surface work under full EPA RRP compliance, including containment, dust control, and proper waste disposal.
  • Neighbor Coordination: Four of twelve elevations bordered neighboring properties and required swing stages and scaffolding; close coordination and daily cleanup allowed construction to proceed without complaints.