1,450 sq ft of efflorescence and calcification remediation across garage perimeter walls, including pressure washing, anti-efflorescence treatment, and a premium concrete coating system to restore appearance and reduce future moisture-related deterioration.

Project Duration: 3 Days

Key challenges overcome:

  • Accelerated Schedule: Completed the entire coating system within a three-day window using high-capacity air movers to accelerate drying in the enclosed garage.
  • Occupied Logistics: Temporarily relocated resident vehicles with advance notice and coordinated movements, minimizing inconvenience to Property Management and residents.
  • Surface Restoration: Pressure washed and mechanically cleaned affected walls before applying an anti-efflorescence treatment and two coats of protective concrete coating.