CSLB License #1033872
320 sq ft of elevated patio waterproofing installed to eliminate water intrusion into the garage below, restoring the integrity of the patio assembly and protecting the structure from future moisture damage.
Project Duration: 1 Week
Key challenges overcome:
- Weather & Schedule Management: Completed the project during the rainy season by sequencing substrate preparation, installation, and curing around available dry periods.
- Contractor Coordination: Coordinated daily with the structural repair contractor, since the waterproofing was a prerequisite for the follow-on garage slab repairs.